WA Iron Ore Mine In-Pit Dewatering Project
Project overview To design, manufacture and commission various in pit dewatering pumps. Fully automatic operation and incorporating remote monitoring and control. Our involvement Built to
Project overview To design, manufacture and commission various in pit dewatering pumps. Fully automatic operation and incorporating remote monitoring and control. Our involvement Built to
Project overview 3 x 40MW Flares including gas filtration. Our involvement • Design specification • Plant design • Procurement and logistics • Installation • Commissioning
Project overview To design, manufacture and commission 2 x skid mounted lighting plants with a total boom of 12.5 metres to achieve light into the
Project overview To design, manufacture and commission 2 x high pressure pumps to dewater the major operating pits of the mine-site. Our involvement • Design
Project Overview Gas fire power plants of all shapes, sizes and applications form part of Eneraque’s core business. All Eneraque value-engineered gas power plants are
Project overview Portable flare skid which can be relocated easily to well heads for well proving and optimisation. Our involvement Eneraque designed and manufactured the
Project overview Overall design, procurement and installation of: • 240MW (thermal) of coal seam gas flaring equipment • 12,000l/second vacuum pump station for coal mine
Project overview Gas drainage and flaring project; creating safe work environment and reducing the carbon footprint was the key reasons for pre-draining gas from coal
Project overview To provide a complete turnkey package – including diesel power generation, fuel storage, switchboard, and earthing grid system – at a remote camp
Project overview To design, manufacture, supply , deliver and commission two horizontal pumping systems to supply power fluid and water flood fluid to an Oil
Project overview Eneraque was engaged to design and manufacture high specification power generation units for the gas compressor stations strategically located along the DBNGP pipeline.
Project overview To design and manufacture an innovative, reliable “genPair” in a revolutionary power plant. The power plant required the capacity to be fuelled by