![](https://eneraque.com/wp-content/uploads/2019/07/Vales-Point-Power-Station-1500kVA-Prime.png)
Vales Point Power Station
Project overview We designed, supplied and installed a 1650kVA Emergency Diesel Generator, including an integral fire suppression system, and external 4000 litre bulk tank. Client
Project overview We designed, supplied and installed a 1650kVA Emergency Diesel Generator, including an integral fire suppression system, and external 4000 litre bulk tank. Client
Project overview Eneraque was contracted to design, supply, install, commission and provide on-going support for a 715kVA Standby Generator including a 4-hour fire rated 3,500
Project overview To design and provide a fully automated power station capable of automatically dispatching and loading generators as demand requires, with the capacity to operate
Project overview Eneraque designed, supplied, installed and commissioned a 550kVA diesel generator and remote 3000lt bulk tank for Ikea North Lakes Project Highlights MegGen Generator
Project overview To provide emergency standby and prime power generation for sites around Australia. All units are designed and supplied for site-specific projects and in
Project overview Eneraque was requested to provide pricing for a 165kva standby diesel generator in an acoustic enclosure, to be installed at both Bellingen and
Project overview Eneraque was contracted to supply, install, commission and provide on-going support for a 2200kVA Standby Diesel Generator in an acoustic enclosure to accommodate
Project overview Find an application process to stir up tailings mud and provide material in slurry form so the dam can be de-silted and the
Project overview This project involved supplying a large quantity of various lighting tower models for use on current and new sites. The first model M66
Project overview This was a development concept as a fully relocatable trailer complete with CAT engine driving a Tuthill blower, pulling gas from 3 separate
Project overview To design, manufacture and commission various in pit dewatering pumps. Fully automatic operation and incorporating remote monitoring and control. Our involvement Built to
Project overview 3 x 40MW Flares including gas filtration. Our involvement • Design specification • Plant design • Procurement and logistics • Installation • Commissioning