Project Overview
Eneraque was engaged to provide pricing and deliver a comprehensive power solution for the Bellingen and Urunga Sewage Treatment Plants (STPs). The scope of the project included the supply and installation of a 165kVA standby diesel generator in an acoustic enclosure at each site. Additionally, the council required three trailer-mounted generators to ensure emergency power could be deployed to any of their remote pump stations in the event of a blackout.
Project Highlights
- Installation of 2 x 165kVA enclosed diesel generators at Bellingen and Urunga STPs.
- Provision of 3 x trailer-mounted generators for emergency power at remote pump stations across the region.