Industry

Product Type

Date

Beltana Flaring Facility Project

Project overview

Gas drainage and flaring project; creating safe work environment and reducing the carbon footprint was the key reasons for pre-draining gas from coal prior to mining. Gas that isn’t drained could cause a safety hazard for underground employees and cause delays in production.

Our involvement

Eneraque was responsible for the design, supply, installation, commissioning and on-going support for a 10,000 m³/hr flaring facility. The gas flares are flaring off the pre-drainage gas from an underground coal mine. The gas quality is in the vicinity of 90–98% CH4 and approaching the flares at a flow rate of 10,000 m³/hr. In the gas header before the flares, there is a gas filter system for removing any dust or foreign particles from the gas supply and a pressure reduction system for bringing the gas pressure down to a required flare inlet pressure.

Outcome and benefits

Once the methane is drained and captured, the gas is burnt at a flaring facility, reducing the CO2 footprint by 21 times compared to free venting. The flares installed were a fully enclosed type flare with emissions monitoring complying to the European emissions standards.

Sign Up To Our Newsletter

Keep up-to-date with our Latest News

  • This field is for validation purposes and should be left unchanged.

Get started with Eneraque

Eneraque has successfully delivered hundreds of project solutions worldwide, across the industrial, civil, mining and commercial industries. We specialise in the engineering, design, manufacture and implementation of conventional and advanced solutions.

Contact Eneraque