Project overview
To design, manufacture and commission 2 x high pressure pumps to dewater the major operating pits of the mine-site.
Our involvement
• Design – The skid-mounted pump and pipework
• Manufacture – Within 8 weeks
• Commission – On-site for 5 days, providing training, setup and start-up commissioning
Outcome and benefits
• High performance pump dewatered pit so that mining operations could continue
• Fuel efficient at optimum performance
• Reliable product, fully supported in the field