Queensland Mining Pit Dewatering Project

Project overview

To design, manufacture and commission 2 x high pressure pumps to dewater the major operating pits of the mine-site.

Our involvement

• Design – The skid-mounted pump and pipework • Manufacture – Within 8 weeks • Commission – On-site for 5 days, providing training, setup and start-up commissioning

Outcome and benefits

• High performance pump dewatered pit so that mining operations could continue • Fuel efficient at optimum performance • Reliable product, fully supported in the field