Project overview
3 x 40MW Flares including gas filtration.
Our involvement
• Design specification
• Plant design
• Procurement and logistics
• Installation
• Commissioning
• Training
• Follow up maintenance
Outcome and benefits
Eneraque delivered the product within an extremely tight time schedule. The whole project was airfreighted out and installed successfully within budget and under extremely difficult weather conditions. Flares installed ensured gas was burnt to comply with the highest level of European emissions standard and this allowed the mine to claim the lowest carbon tax emissions output.