Tahmoor Gas Flare Facility Project

Project Overview

Eneraque was engaged to supply and install three 40MW flares with integrated gas filtration for a large mining operation. This critical project aimed to control and manage gas emissions while ensuring compliance with stringent environmental regulations.

Our Involvement

Eneraque played a comprehensive role throughout the project, overseeing several key stages, including:

  • Design Specification: We collaborated with the client to develop a custom design that met their specific operational needs and environmental requirements.
  • Plant Design: Our team provided full-scale plant design, integrating the 40MW flares with gas filtration systems to optimise performance and compliance.
  • Procurement and Logistics: Eneraque managed the procurement process, sourcing high-quality materials and components, and coordinated complex logistics, including airfreighting the entire project to the remote mine site.
  • Installation: Despite challenging weather conditions, our team successfully installed the flares and gas filtration systems on-site.
  • Commissioning: We ensured all systems were fully operational and meeting the required performance standards during the commissioning phase.
  • Training: Eneraque provided on-site training to the client’s operational staff, ensuring they were equipped to manage and maintain the equipment effectively.
  • Follow-Up Maintenance: We continue to offer ongoing maintenance support, ensuring the long-term reliability and efficiency of the system.

Outcome and Benefits

Eneraque delivered the project within an extremely tight schedule, ensuring the client’s operational needs were met without delay. The entire system was airfreighted and successfully installed within budget, overcoming logistical and environmental challenges such as adverse weather conditions.

The installed flares not only ensured compliance with the highest European emissions standards, but they also allowed the mining operation to achieve the lowest carbon tax emissions output possible. This compliance significantly reduced the mine’s operational costs by minimising carbon taxes, while also contributing to the company’s sustainability and environmental goals.