Brisbane Sky Tower

Project overview Supply and installation of three generators on multiple levels of the building. Eneraque supplied and installed each generator into their own dedicated plantroom

Vales Point Power Station

Project overview We designed, supplied and installed a 1650kVA Emergency Diesel Generator, including an integral fire suppression system, and external 4000 litre bulk tank.  Client

St Andrew’s Ipswich Hospital

Project overview Eneraque was contracted to design, supply, install, commission and provide on-going support for a 715kVA Standby Generator including a 4-hour fire rated 3,500