Clean, green energy machine! We’re partnering with New Zealand’s First Renewables (part of Clarus) to secure our energy future.
In it’s final stages of testing in our Brisbane Manufacturing and Maintenance Hub, this bold container is part of a state of the art Biogas Upgrading System that will upgrade biogas from organic kerbside waste into pipeline quality Biomethane. The biomethane will be injected into the gas grid as a renewable form of energy for residential and industrial supply, to generate enough energy to annually power up the equivalent of around 2500 households in the region.
Pictured are Eneraque Renewables’ Project Manager Daniel Politylo and Clarus’ Senior Project Manager Tim Lepper (Clarus).