Project overview
Overall design, procurement and installation of:
• 240MW (thermal) of coal seam gas flaring equipment
• 12,000l/second vacuum pump station for coal mine goaf gas extraction and for inseam gas collection
• Gas measuring and monitoring equipment certified to National Greenhouse Gas Emission Reporting Scheme (NGERS) standards
• Overall electrical supply and control systems
Our involvement
• Design specification
• Plant design
• Procurement and logistics
• Installation
• Commissioning
• Training
• Follow up maintenance
Outcome and benefits
Eneraque delivered the product within an extremely tight time schedule. The whole project was airfreighted out and installed successfully within budget and under extremely difficult weather conditions. Flares installed ensured gas was burnt to comply with highest level of European emissions standard.