Project overview

Supply and installation of three generators on multiple levels of the building. Eneraque supplied and installed each generator into their own dedicated plantroom with an acoustic exhaust system. Once each generator was installed it was then commissioned and proven against the building electrical system. 

Project Highlights

  • MegaGen Generator OV550S, 550kVA Standby
  • MegaGen Generator OV550S, 550kVA Standby
  • MegaGen Generator OD550S, 330kVA Standby
  • Volvo & Doosan engines
  • Stamford Alternators
  • Deep Sea automatic controllers
  • 1100lt bunded tanks incorporated within the base generator base frame

Client Need

The client wanted a full turnkey project from design, supply, install and commission to which Eneraque proudly provided the full in-house capability to carry out a project of this nature. The project required the generators to be ready at certain dates without delay so that they could be lowered down through the roof above each room. Once each generator was installed, each room above was then installed so that the building could continue it’s construction.

Turnaround

14 weeks from approval.

Our Approach

Eneraque was chosen based on experience, turnkey solutions and the ability to provide a package with no scope gaps. The project required an extra 550kVA. Eneraque air-freighted the major components to ensure the building construction was not interrupted.

Outcome/Benefits

The project was installed and completed on time to ensure early tenants would have backup power.