Case Study: Powering the Future of Gold Coast International Airport

Gold Coast International Airport, a high-traffic hub located at Coolangatta on Queensland’s Gold Coast, faced a critical need for a next-generation back up power system. Eneraque was approached to deliver this sophisticated power solution, ensuring seamless operations and addressing the specific requirements of the airport.

Project Overview

The client required a custom-built power generation package comprising two units powered by V20 MTU solutions engines, each rated at 2800kVA 11kV. These units needed to be housed in custom aircraft-grade aluminium enclosures and feature 3,000L in-built self-bunded fuel tanks to provide critical backup power.

Scope of Work

Eneraque’s responsibilities encompassed:

  • Design
  • Manufacture
  • Testing
  • Commissioning
  • Installation

The goal was to deliver a series of diesel generators tailored to the client’s needs, adhering to stringent specifications and performance criteria.

Our Solution

To meet the client’s requirements, Eneraque developed a solution with the following key specifications:

  • Noise Level: 72 dBA @ 1m
  • Critical Specification Compliance: Ensuring all operational and safety standards were met
  • Ambient Temperature: Capable of operating efficiently at 50°C
  • Synchronisation: Synchronising to an 11kV Ring Main
  • Custom Enclosures: Designed with aircraft-grade aluminium
  • Fire Suppression: Integrated fire suppression system
  • HV String Testing: Ensuring high voltage string reliability
  • Control System: Master PLC control system for seamless operation

 

Key Highlights

Enhanced Scope and Control Systems

Eneraque went beyond the initial scope by taking on the responsibility of completing a complex site control system. This proactive measure was critical in addressing the potential liquidated damages (LD’s) risk due to the failure of the initially chosen contractor to fulfil their obligations.

Timely Delivery

The project was delivered well ahead of schedule, a testament to Eneraque’s efficient project management and execution capabilities. This early completion provided significant benefits to the client, ensuring readiness and reliability of the backup power system.

Seamless Integration

The integration of the power generation units was executed flawlessly, providing the client with a smooth and hassle-free experience. This ensured that the airport’s operations could continue without interruption during the transition.

Exceeding Performance Expectations

A noteworthy achievement of the project was the generator’s performance. Initially required to operate at 85 dBA @ 1 metre, the final outcome surpassed expectations, achieving a noise level of only 72 dBA @ 1 metre on full load. This reduction in noise levels was significant, enhancing the operational environment at the airport.

Conclusion

The success of this project underscores Eneraque’s commitment to proactive problem-solving, technical proficiency, and delivering results that exceed client expectations. The Gold Coast International Airport now benefits from a robust, custom-built power generation solution that ensures critical backup power with enhanced performance and reliability.

Eneraque’s ability to comply with stringent specifications, take on additional scope, and deliver ahead of schedule highlights the company’s capability to handle complex projects efficiently. This project serves as a benchmark for future initiatives in the field of power generation solutions.