The latest arrival to the Eneraque production facility is another MWM 2020V12 to be installed in an Eneraque purpose-built module for a landfill power application.
This 1.2 MW engine has been chosen for its reduced maintenance and operation costs, and it’s renowned high efficiency and increased output.
This particular MWM will be packaged into a single lift module and pre-tested prior to site delivery to supply clean energy to the Electricity Grid, turning waste into clean energy.
For all your waste to energy projects, get in touch with Eneraque on 1800 636 744 or [email protected]