South Flank - Mulla Mulla Camp Expansion - Stand By Silenced Diesel Generators South Flank - Mulla Mulla Camp Expansion - Stand By Silenced Diesel Generators South Flank - Mulla Mulla Camp Expansion - Stand By Silenced Diesel Generators South Flank - Mulla Mulla Camp Expansion - Stand By Silenced Diesel Generators
South Flank - Mulla Mulla Camp Expansion - Stand By Silenced Diesel Generators South Flank - Mulla Mulla Camp Expansion - Stand By Silenced Diesel Generators South Flank - Mulla Mulla Camp Expansion - Stand By Silenced Diesel Generators South Flank - Mulla Mulla Camp Expansion - Stand By Silenced Diesel Generators

Industry

Product Type

Date

South Flank – Mulla Mulla Camp Expansion

Project Overview:

Eneraque was engaged by a top-tier global mining client to facilitate the design, manufacture, supply, installation & commissioning of 8 x 1500kVA diesel generators. The client required a reliable backup power solution to power mine operations, as well as the remote accommodation camp on site. The camp itself includes multiple kitchens, water treatment plants, accommodation dwellings, administration offices and recreational areas for staff. Eneraque’s response to the client’s tender request was very well received, as the solution proposed completely satisfied all requirements and was able to be delivered to budget and within the designated time frame.

Project Highlights:

  • Successful delivery of turnkey standby power plant
  • Tailored to the client’s requirements
  • 8 x 1500kVA Silenced Diesel Generators
  • 40 Hours continuous runtime
  • Exceeded site noise requirements
  • Another satisfied return client

Project Outcomes:

The client was very satisfied with Eneraque’s punctuality, communication and documentation throughout the design, manufacture and installation of the equipment. Post commissioning, the equipment quality as well as level of workmanship cemented Eneraque’s position as a supplier of choice for many clients of this calibre. Noise requirements for this project were very stringent, Eneraque’s range of Megagen Silenced Generators exceeded expectations on this front. In terms of runtime and convenience, the client required the standby power plant to have the capacity to run for 24 hours continuously. Eneraque was pleased to provide a solution that offered 40 hours of operation without refuelling, increasing ease of operation and decreasing the labor intensity needed to provide reliable standby power to the camp and mine. For more information on this project please do not hesitate to reach out to our friendly team of mining power generation specialists!