Project overview.
In 2013, Eneraque were contracted to design, manufacture and deliver multiple high specification lighting towers to meet the night time operating requirements of a high-profile Queensland mine. Fast forward 11 years, this globally known client approached Eneraque after the original Metal Halide lights fitted to the lighting skid became a discontinued product and were unable to be sourced.
The original build.
This S1224 super skid was designed to have an impressive 15-meter horizontal reach after clearing the skid. This unit provides effective safe operation and stadium-style of lighting for the highwall into the mining pit.
Eneraque Solution.
Design, engineering, fabrication and commissioning.
Eneraque designed, engineered and retrofitted an LED light solution to replace the metal halide lights. These new lights last longer, are more energy efficient, require less maintenance and easily sourced, further extending the life cycle of this hardworking piece of equipment.
Outcome/Benefits.
- Sourced and retrofitted in house in our Brisbane Manufacturing & Maintenance Hub
- Rapid turnaround to fast track our client’s operational time.
- Customised, smart solution to improve an already robust piece of equipment.